Place of Origin: | CHINA |
---|---|
Brand Name: | TGFQ |
Model Number: | TM04A |
Minimum Order Quantity: | 1 |
Price: | 1000.00-5000.00USD |
Packaging Details: | NNER PACKING: Wrap by plastic film, clear label for each item. OUTER PACKING: Carton or Plywood Case PACKING SIZE: Depend on packing type |
Delivery Time: | 1-3days |
Payment Terms: | L/C, T/T, D/P, D/A |
Supply Ability: | 100 Pcs / Month |
Model: | TM04A | Product Name: | Excavator Final Device Assy |
---|---|---|---|
Place Of Origin: | Guangdong, China | Frame: | 9+4 |
Sprocket: | 12holes | Brand: | TGFQ |
High Light: | PC35 Hydraulic Excavator Final Drive,EX35 Excavator Final Drive,TM04A Excavator Final Drive |
TGFQ B37 E303.5 EX35 PC40.6 PC30 PC35 Hydraulic Excavator TM04A Final Drive
What is final drive in mechanical engineering?
“The final drive is the final point of contact between the engine and the transmission. It is a mechanical device, which converts torque from the engine to mechanical power.” “Power take-off (PTO) is a type of electrical system that transfers electrical energy from a source to an output.
We have more than 4000 square meters of three-dimensional warehouse and more than 2000 square meters of outdoor warehouse
It ensures that we have sufficient inventory and respond to customers' needs faster. Fast delivery is our advantage.
FAQ:
Q: What can you do?
A: We can provide you with digging final drive and swing drive motors and reducer gearbox and their parts.
Q: Can I order one of our samples for testing first?
A: Of course!
Q: How do I order?
A: You need to tell us the model and quantity you are interested in, and then we will issue a proforma invoice for you. The goods will be prepared after receiving the payment. The preparation time depends on the content of the order.
Q: Do you have a factory?
A: Yes, we have our own factory and have 23 years of production experience in the excavated gear industry.