Place of Origin: | CHINA |
---|---|
Brand Name: | TGFQ |
Model Number: | R290-3 R300-5 |
Minimum Order Quantity: | 1 |
Price: | 500.00-1000.00USD |
Packaging Details: | NNER PACKING: Wrap by plastic film, clear label for each item. OUTER PACKING: Carton or Plywood Case PACKING SIZE: Depend on packing type |
Delivery Time: | 1-3days |
Payment Terms: | L/C, T/T, D/P, D/A |
Supply Ability: | 500 pcs / month |
Product Name: | Excavator Travel Gearbox | Model: | R290-3 R300-5 |
---|---|---|---|
Part Number: | 3550D-01A | Outer Packing: | Wooden Case Packing |
Port: | Huangpu | Package Size: | 54*54*56 CM |
Highlight: | R290-3 Reduction Gearbox,R300-5 Reduction Gearbox,3550D-01A Reduction Gearbox |
TGFQ R290-3 R300-5 3550D-01A Reduction Gearbox Reducer Spare Parts Kit
Product Parameter:
Appliion: | Crawler Excavator |
Place of Origin: | Guangzhou |
Model: | R290-3 R300-5 |
Part Number: | 3550D-01A |
Material: | Steel |
Condition: | New |
Please Attention: | 1. Factory direct price 2. Nice quality 3. Free video and pictures of examine goods before shipment 4. Small order welcome, Support one peice to delivery |
Pos. | Part No | Qty | Parts name |
N*-2. | 3550D-01A | [1] | T/REDUCTION GEAR |
N*-2. | 3550D-01B | [1] | T/REDUCTION GEAR |
N*-2. | 3550D-01C | [1] | T/REDUCTION GEAR |
1 | 3523170-0045 | [1] | GEAR-RING |
2 | 3523310-0160 | [1] | HOUSING |
4 | 3523150-0334 | [1] | COVER-SIDE |
4 | 3523150-0488 | [1] | COVER-SIDE |
5 | 3524120-0052 | [1] | CARRIER-NO1 |
6 | 3524120-0057 | [1] | CARRIER-NO2 |
6 | 3524120-0085 | [1] | CARRIER-NO2 |
9 | 3503190-0109 | [1] | GEAR-SUN,NO1 |
10 | 3503190-0110 | [1] | GEAR-SUN,NO2 |
11 | 3503190-0143 | [1] | GEAR-SUN,NO3 |
12 | 3503190-0117 | [2] | GEAR-PLANE,NO1 |
13 | 3503190-0113 | [3] | GEAR-PLANE,NO2 |
14 | 3503190-0141 | [4] | GEAR-PLANE,NO3 |
16 | 3503540-0126 | [3] | PIN-NO2 |
16 | 3503540-0288 | [3] | PIN-NO2 |
17 | 3503540-0122 | [4] | PIN-NO3 |
18 | 3524750-0190 | [2] | PLATE-SIDE |
18 | 3524750-0370 | [2] | PLATE-SIDE |
19 | 3524750-0179 | [6] | PLATE-SIDE |
20 | 3524750-0219 | [8] | PLATE-SIDE |
21 | PKT507028 | [2] | CAGE-NEEDLE |
22 | PKT506532X | [3] | CAGE-NEEDLE |
23 | PBN506006HSCX | [4] | CAGE-NEEDLE |
24 | P1R455028 | [2] | RING-INNER |
25 | 3503370-0241 | [4] | BUSHING |
26 | 35050BAA-024 | [1] | RING-THRUST |
26 | 35050BAA-024 | [2] | RING-THRUST |
27 | 3503160-0105 | [1] | RING-THRUST |
29 | OSBM16100 | [28] | SCREW-HEX |
30 | OSBM820 | [12] | SCREW-HEX SOC HD |
32 | OBP12 | [3] | PLUG |
33 | PAC6037 | [2] | BEARING |
K034. | P353 | [1] | SEAL |
N035. | 3526330-0017 | [1] | SHIM |
N035. | 3526330F0028 | [1] | SHIM(2.5T) |
N035. | 3526330G0028 | [1] | SHIM(2.65T) |
N035. | 3526330H0028 | [1] | SHIM(2.7T) |
36 | OSPV425 | [3] | PIN-SPRING |
36 | OSPV625 | [3] | PIN-SPRING |
37 | ORR42 | [4] | RING-SNAP |
42 | 35050BAA-042A | [1] | SHIM(0.5T) |
42 | 35050BAA-042B | [1] | SHIM(1.0T) |
44 | OSR45 | [2] | RING-SNAP |
45 | PWR95 | [1] | CLIP |
46 | PWR130 | [1] | CLIP |
47 | PSR300 | [1] | RING-SNAP |
48 | OSR40 | [1] | RING-SNAP |
K081. | PCPP323 | [1] | O-RING |
K082. | PCPP378 | [1] | O-RING |
S. | 3521120-0031 | [1] | CARRIER SUB-NO1 |
S. | 3521120-0053 | [1] | CARRIER SUB-NO1 |
S. | 3521120-0033 | [1] | CARRIER SUB-NO2 |
S. | 3521120-0062 | [1] | CARRIER SUB-NO2 |
K. | 3502255-0134 | [1] | SEAL KIT(034,081,082) |
We have more than 4000 square meters of three-dimensional warehouse and more than 2000 square meters of outdoor warehouse
It ensures that we have sufficient inventory and respond to customers' needs faster. Fast delivery is our advantage
FAQ:
common problem:
Q: What can you do
A: We can provide you with digging final drive and swing drive motors and reducer gearbox and their parts
Q: how long is the warranty period?
A: Within 6 months, we will provide you with maintenance spare parts within the warranty period free of charge.
Q: do you accept OEM or ODM?
A: Yes, you just need to provide your logo file or ideas.
Q: can I order one of our samples for testing first?
A: Of course!
Q: how do I order?
A: You need to tell us the model and quantity you are interested in, and then we will issue a proforma invoice for you. The goods will be prepared after receiving the payment. The preparation time depends on the content of the order
Q: do you have a factory?
A: Yes, we have our own factory and have 20 years of production experience in the excavated gear industry.