Place of Origin: | CHINA |
---|---|
Brand Name: | TGFQ |
Model Number: | DH215-9 DH225-9 |
Minimum Order Quantity: | 1 |
Price: | 200.00-800.00USD |
Packaging Details: | NNER PACKING: Wrap by plastic film, clear label for each item. OUTER PACKING: Carton or Plywood Case PACKING SIZE: Depend on packing type |
Delivery Time: | 2-3days |
Payment Terms: | L/C, T/T, D/P, D/A |
Supply Ability: | 2000 pcs / month |
Product Name: | DAEWOO Excavator Spare Parts | Model: | DH225-9 DH215-9 |
---|---|---|---|
Port: | Huangpu | Applicable Industries: | Machinery Repair Shops, Energy & Mining |
Detail: | 4/16Holes | Packing Size: | 25*25*30 CM |
Highlight: | DH225-9 DAEWOO Excavator Spare Parts,DH215-9 Excavator Spare Parts,DH215-9 DAEWOO Spare Parts |
DH215-9 DH225-9 DAEWOO Excavator Spare Parts
Dawoo DH215-9 DH225-9 Excavator Swing Motor Case Apply For Swing Motor Assy Doosan
Product Parameter: | |
Product Name: | Excavator Spare Parts |
Place of Origin: | China (Mainland) |
Model Number: | DH215-9 DH225-9 |
Price: | Factory Price |
Payment term: | L/C, T/T, D/P, D/A |
Means of Transport: | By Sea, By Air or By Express |
Product Photo:
We have more than 4000 square meters of three-dimensional warehouse and more than 2000 square meters of outdoor warehouse
It ensures that we have sufficient inventory and respond to customers' needs faster. Fast delivery is our advantage
FAQ:
Common problem:
Q: What can you do
A: We can provide you with digging final drive and swing drive motors and reducer gearbox and their parts
Q: How to ensure the quality?
A: We produce as per the confirmed technology or drawings for each order for our customers. And our factory has a strict quality control system. We inspect goods during production according to a certain frequency and we also perform the final inspection before the goods are packed.
Q: Can I order one of our samples for testing first?
A: Of course!
Q: How do I order?
A: You need to tell us the model and quantity you are interested in, and then we will issue a proforma invoice for you. The goods will be prepared after receiving the payment. The preparation time depends on the content of the order
Q: Do you have a factory?
A: Yes, we have our own factory and have 23 years of production experience in the excavated gear industry.