Place of Origin: | CHINA |
---|---|
Brand Name: | TGFQ |
Model Number: | E 320D E 320C |
Minimum Order Quantity: | 1 |
Price: | 1000.00-5000.00usd |
Packaging Details: | NNER PACKING: Wrap by plastic film, clear label for each item. OUTER PACKING: Carton or Plywood Case PACKING SIZE: Depend on packing type |
Delivery Time: | 2-3days |
Payment Terms: | L/C, T/T, D/P, D/A |
Supply Ability: | 50 pcs / month |
Egory: | Construction Machinery Parts | Product Name: | Final Drive Assy |
---|---|---|---|
Model: | E 320D E 320C | Place Of Origin: | China |
Outer Packing: | Wooden Case | Applicable Industries: | Machinery Repair Shops, Energy & Mining |
High Light: | 320D Excavator Final Drive,320C Excavator Final Drive,215-9982 |
215-9982 Excavator Final Drive E320D E320C Excavator Spare Parts
TGFQ 215-9982 E320D E320C Final Drive Assembly Excavator Spare Parts
Pos. | Part No | Qty | Parts name |
1 | 209-5992 Y | [1] | MOTOR GP-TRAVEL |
2 | 204-2819 Y | [1] | VALVE GP-TRAVEL COUNTERBALANCE |
3 | 095-0707 M | [3] | BOLT (M16X2X120-MM) |
4 | 3E-6910 M | [6] | BOLT-SOCKET HEAD (M12X1.75X70-MM) |
5 | 095-1685 | [1] | SEAL-O-RING |
M | METRIC PART | ||
R | REMANUFACTURED PART MAY BE AVAILABLE | ||
Y | SEPARATE ILLUSTRATION |
We have more than 4000 square meters of three-dimensional warehouse and more than 2000 square meters of outdoor warehouse
It ensures that we have sufficient inventory and respond to customers' needs faster. Fast delivery is our advantage
FAQ:
common problem:
Q: What can you do
A: We can provide you with digging final drive and swing drive motors and reducer gearbox and their parts
Q: how long is the warranty period?
A: Within 6 months, we will provide you with maintenance spare parts within the warranty period free of charge.
Q: do you accept OEM or ODM?
A: Yes, you just need to provide your drawing or ideas.
Q: can I order one of our samples for testing first?
A: Of course!
Q: how do I order?
A: You need to tell us the model and quantity you are interested in, and then we will issue a proforma invoice for you. The goods will be prepared after receiving the payment. The preparation time depends on the content of the order
Q: do you have a factory?
A: Yes, we have 23 years of production experience in the excavated gear industry.